Friday, March 30, 2012

29-03-2012: Bulkheads

The bulkheads is covered with one layer of fiberglass - one side at a time. I mixed iron oxide in the epoxy to give it a nice black color.

Tuesday, March 27, 2012

27-03-2012: Bulkheads

Today I was not in the mood to be playing with epoxy so I started on the bulkheads. I used my old stations as a template. To shape the polystyrene I used my disc sander. I was glad I have a vacuum cleaner attached to the sander..
This is the bulkhead behind the cockpit.




The bulkhead in front of the cockpit.

Saturday, March 24, 2012

24-03-2012: Joining the hull and deck - right side

I am now ready to reinforce the right side inside.
Once again it takes a lot of patience.









Sunday, March 18, 2012

18-03-2012: Joining the deck and hull - left side

I am now ready to reinforce the deck -hull joint with a band of fiberglass. 

It is very difficult to put the epoxy in place. I both takes some gymnastic skills and some innovative tools. Here my "telescopic cup of epoxy".
And my "how to place the fiberglass band" tool:


Monday, March 12, 2012

12-03-2012: Tubing for the skeg wire

The epoxy has now hardened and its time to remove the silicone tube.

The silicone tube is very difficult to pull out, but a drop of ethanol does the trick.


The tube for the skeg wire is now pushed in place.


And finally the deck and hull are put together. I used all the straps and rope and tape I could get hold on to hold it in place. before I glued the two together with epoxy I waited a day to ensure myself that I had not forgotten anything..

Sunday, March 11, 2012

11-03-2012: Reinforcing the hull

To hold the tubing for the skeg wire I made a canal using the same principles. 
To remove the silicone tube when the epoxy has hardened I use a drop of ethanol. The ethanol makes it very easy to pull out the silicone tube.

I decided to reinforce the hull where the cockpit is located by laying more layers of fiberglass. Right where the cockpit opening is located there are now three layers of fiberglass and at the paddlers feet there is now two layers.

Saturday, March 3, 2012

03-03-2012: More deck fittings

In front of the cockpit I want some bungee cord for storing things. The bungee cord is here placed as a test to checkout the positioning.


Holes marked up and ready for the drill. I used The two test strips to determine the spacing between the holes.

Tubing in place on the bow end ready for epoxy on the inside.

Starting to mark up for the bungee cord behind the cockpit.

To test before drilling the holes I use a mockup to hold the bungee.




Satisfied with the test and sure everything is OK I drill the holes....


When turning over the deck I realize that there was something I had forgotten... But I was lucky. The holes is very close to the eye pad, but it's OK.


Both the holes in front of and behind the cockpit is now covered with fiberglass.


Thursday, March 1, 2012

01-03-2012: Deck fittings

On the bow end of the deck I plan to have a couple of bungee cords to stick my paddle under.
I mark the positions very carefully before drilling the holes...


As spacekeepers I use silicone tubing with a piece of string inside. The string is to keep the tube from collapsing.


Ready to cover the tubing with epoxy.

The tubing is now covered with fiberglass.